Category: | Cycleway: A problem that needs to be fixed |
Tags: | droppedkerbsalford, gmcc, loveyourbike, lyb, manchester, mcc, mediacity, metrolink, ncn55, planning, priority, salford, scc, tram, tramline, tramlines, velocity2025 |
Date time: | 12.31pm, Wednesday 1st March, 2017 |
Time line: | Earlier | Later |
Facing: | West |
Added by: | riccardo |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Greater Manchester |
Salford Broadway Needs wider pavement to get passed bus stop. This cycleway is a good alternative route from Eccles to Manchester to avoid the tram rails on Eccles New Road #70272
Comments reflect the views of the original submitter only.