Category: | A sign, usually on the cycleway network, indicating a route for cycling.: A problem that needs to be fixed |
Tags: | None |
Date time: | 5.58pm, Saturday 13th August, 2016 |
Time line: | Earlier | Later |
Facing: | West |
Added by: | riccardo |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | gmcc, manchester, mcc, planning, salford, scc, velocity2025 |
Area: | Greater Manchester |
5 NEW SIGNS REQUIRED TO DIVERT CYCLISTS SAFELY - Salford - Adelphi St. Adelphi Wharf Apartments NCN route 6 David Ashley Construction and Fortis Developments have blocked the path and only one diversion sign is in place from Aldephi St direction. A minimum of 6 diversion signs are needed (3 in each direction.) SEE ALSO #83618 #83617
Comments reflect the views of the original submitter only.